ADC Trapper Forum

No Profanity *** No Flaming *** No Advertising *** No Anti Trappers *** No Politics
No Non-Target Catches *** No Links to Anti-trapping Sites *** No Avoiding Profanity Filter


Home~Trap Talk~ADC Forum~Trap Shed~Wilderness Trapping~International Trappers~Fur Handling

Auction Forum~Trapper Tips~Links~Gallery~Basic Sets~Convention Calendar~Chat~ Trap Collecting Forum

Trapper's Humor~Strictly Trapping~Fur Buyers Directory~Mugshots~Fur Sale Directory~Wildcrafting

Trapper's Tales~Words From The Past~Legends~Archives~Kids Forum~Lure Formulators Forum


~~~ Dobbins' Products Catalog ~~~


WCS
(Please support Wildlife Control Supplies, our sponsor for the ADC Page)






Print Thread
Hop To
Pricing bat jobs #5002311
04/09/15 10:14 AM
04/09/15 10:14 AM
Joined: Dec 2006
Posts: 2,061
Ames, IA
MikeTraps2 Offline OP
trapper
MikeTraps2  Offline OP
trapper

Joined: Dec 2006
Posts: 2,061
Ames, IA
I'm trying to get better at pricing bat jobs, and have gone to flat rates vs hourly. I remember someone had a checklist for houses that added to the cost? Things like dormers, steepness of the roof, condition of roof etc?

I think it was Paul.

Anyone got a tried and true method for figuring the costs to do a bat seal and exclusion?


Far better is it to dare mighty things, to win glorious triumphs, even though checkered by failure

Theodore Roosevelt
Re: Pricing bat jobs [Re: MikeTraps2] #5002341
04/09/15 10:42 AM
04/09/15 10:42 AM
Joined: Jul 2008
Posts: 1,361
mequon, wisconsin
P
Paul Winkelmann Offline
trapper
Paul Winkelmann  Offline
trapper
P

Joined: Jul 2008
Posts: 1,361
mequon, wisconsin
It wasn't this Paul because I'm not smart enough to do guesstimates. We have adopted a pretty good policy on all of our bidding work.

It's actually quite simple; the guy that's going to do the work, does the bidding. If he needs a crew, that needs to be taken into

consideration. This way, nobody need ever ask again, "What idiot bid this job?" The answer is, "Look in the mirror."

Re: Pricing bat jobs [Re: Paul Winkelmann] #5002409
04/09/15 11:52 AM
04/09/15 11:52 AM
Joined: Dec 2006
Posts: 2,061
Ames, IA
MikeTraps2 Offline OP
trapper
MikeTraps2  Offline OP
trapper

Joined: Dec 2006
Posts: 2,061
Ames, IA
Yeah Paul but I'm that idiot! Maybe it was Ron - I know it was someone who does a lot of bats

Just trying to streamline it, feel I am doing ok so far but want to make less mistakes etc


Far better is it to dare mighty things, to win glorious triumphs, even though checkered by failure

Theodore Roosevelt
Re: Pricing bat jobs [Re: MikeTraps2] #5002554
04/09/15 01:51 PM
04/09/15 01:51 PM
Joined: Feb 2007
Posts: 1,124
Killingly, CT
Brian Mongeau Offline
trapper
Brian Mongeau  Offline
trapper

Joined: Feb 2007
Posts: 1,124
Killingly, CT
Mike, clean out your mailbox.

Re: Pricing bat jobs [Re: MikeTraps2] #5002560
04/09/15 01:54 PM
04/09/15 01:54 PM
Joined: Jul 2008
Posts: 1,361
mequon, wisconsin
P
Paul Winkelmann Offline
trapper
Paul Winkelmann  Offline
trapper
P

Joined: Jul 2008
Posts: 1,361
mequon, wisconsin
Yeah Mike, and while your at it, you could clean out my garage. It's a mess!

Re: Pricing bat jobs [Re: Paul Winkelmann] #5002569
04/09/15 02:07 PM
04/09/15 02:07 PM
Joined: Dec 2006
Posts: 2,061
Ames, IA
MikeTraps2 Offline OP
trapper
MikeTraps2  Offline OP
trapper

Joined: Dec 2006
Posts: 2,061
Ames, IA
Paul that is done on an hourly rate or can be exchanged for mentoring services laugh


Far better is it to dare mighty things, to win glorious triumphs, even though checkered by failure

Theodore Roosevelt
Re: Pricing bat jobs [Re: MikeTraps2] #5003264
04/09/15 11:40 PM
04/09/15 11:40 PM
Joined: Dec 2006
Posts: 1,476
Central IA
TRapper Offline
trapper
TRapper  Offline
trapper

Joined: Dec 2006
Posts: 1,476
Central IA
Guesstimate your hours to complete....take in to account the last trip to remove bat valves and reinspect...then add 5 hours....that is what i do typically as i know it usually takes longer once i get into the job....then figure out roughly materials needed....it is better to over estimate than under....you can always give the customer a break on the last pmt

Have to bid at what you are willing to do the job for

Last edited by TRapper; 04/09/15 11:41 PM.
Previous Thread
Index
Next Thread




Powered by UBB.threads™ PHP Forum Software 7.7.1